SL260 BT CAVES INDUSTRIAL PARK 5 (BARAT)
Rapid KL Bus · Open in maps
Routes at this stop
Next departures (as of 5:13 PM Malaysia time)
| Time | Route | Towards | In |
|---|---|---|---|
| 17:13 ~ | 171 | HAB WIRA DAMAI | Now |
| 17:43 ~ | 171 | HAB WIRA DAMAI | 30 min |
| 18:13 ~ | 171 | HAB WIRA DAMAI | 1 h 0 min |
| 18:43 ~ | 171 | HAB WIRA DAMAI | 1 h 30 min |
| 19:38 ~ | 171 | HAB WIRA DAMAI | 2 h 25 min |
| 20:43 ~ | 171 | HAB WIRA DAMAI | 3 h 30 min |
| 21:38 ~ | 171 | HAB WIRA DAMAI | 4 h 25 min |
| 22:29 ~ | 171 | HAB WIRA DAMAI | 5 h 16 min |
| 23:24 ~ | 171 | HAB WIRA DAMAI | 6 h 11 min |
| 00:09 ~ | 171 | HAB WIRA DAMAI | 6 h 56 min |
Scheduled times. Services marked ~ run at a frequency rather than to a fixed timetable.